Plans and Specs
Plans and Specs.
Start
Congratulations - you have completed Plans and Specs..
You scored %%SCORE%% out of %%TOTAL%%.
Your performance has been rated as %%RATING%%
Your answers are highlighted below.
Question 1 |
Drawings that show a building's location along with topographic details, such as contour lines and
trees, are called _____ plans.
A | site |
B | topographic |
C | architectural |
D | foundation |
Question 2 |
Drawings that show the horizontal view of a building, the length and width of the building, and
the floor layout of the rooms are called _____.
A | elevation drawings |
B | site plans |
C | foundation plans |
D | floor plans |
Question 3 |
Drawings that show the exterior style of a building are called _____.
A | elevation drawings |
B | site plans |
C | foundation plans |
D | floor plans |
Question 4 |
Schedules for mechanical equipment typically show both _____ for each item of equipment listed.
A | types and cost |
B | types and sizes |
C | installed location and cost |
D | quantity and location |
Question 5 |
Enlarged views that show special features of a building such as the installation of a diffuser with a
fire damper are called _____ drawings.
A | detail |
B | sectional |
C | isometric |
D | elevation |
Question 6 |
Drawings that show a cutaway view of the inside of an object or building are called _____
drawings.
A | section |
B | isometric |
C | detail |
D | elevation |
Question 7 |
The locations where water closets are installed in a large commercial building are normally shown
on the _____ plans.
A | structural |
B | plumbing |
C | mechanical |
D | floor |
Question 8 |
The locations where HVAC equipment is installed in a large commercial building are normally
shown on the _____ plans.
A | structural |
B | plumbing |
C | mechanical |
D | floor |
Question 9 |
In the event that you find a discrepancy between the plan drawings and specifications for a job, you
should _____.
A | submit an RFI to the architect |
B | submit an RFI to the general contractor |
C | notify your foreman about the discrepancy |
D | submit an RFI to the project superintendent |
Question 10 |
The special and general conditions portions of a specification cover the _____ aspects of contractual
arrangements.
A | technical |
B | non-technical |
C | equipment and materials |
D | both non-technical and technical |
Question 11 |
A type of drawing that shows the exact layout for a run of ductwork including the sizes and types
of duct fittings and the types of connectors and hangers is a _____.
A | cut list |
B | mechanical plan |
C | structural steel shop drawing |
D | sheet metal shop drawing |
Question 12 |
The normal sequence in which drawings are produced to describe the ductwork system for a
project is _____.
A | shop drawings, cut lists, mechanical plan |
B | shop drawings, mechanical plan, cut lists |
C | mechanical plan, cut lists, shop drawings |
D | mechanical plan, shop drawings, cut lists |
Question 13 |
A drawing that shows a special piece of equipment or accessory to be purchased for a job, given by
the HVAC contractor to the general contractor, is called a(n) _____.
A | cut list |
B | submittal |
C | as-built drawing |
D | shop drawing |
Question 14 |
As-built drawings become part of the _____.
A | RFI |
B | permanent files for the building's mechanical system |
C | shop drawings |
D | submittal |
Question 15 |
When doing a quantity takeoff, the last step is to _____.
A | review the specifications and seek clarification, if necessary |
B | total the quantities per category of material |
C | determine the scope of the work to be done |
D | list the materials specified for each system |
Question 16 |
Standard takeoff sheets are used to ____________.
A | provide a permanent record, reduce the workload, and supplement the as-built drawings |
B | supplement the as-built drawings, decrease the potential for error, and provide a permanent
record |
C | decrease the potential for error, reduce the workload, and provide a permanent record |
D | reduce the workload, decrease the potential for error, and supplement the as-built drawings |
Question 17 |
The distance from the outside of the north wall to the center of the side window in the master
bedroom shown in the attached figure is _____.
http://tekassistclasses.com/wp-content/uploads/2012/02/PL-PRT-17.pdf
A | 12'-6" |
B | 11'-6" |
C | 9'-0" |
D | 8'-0" |
Question 18 |
The sanitary/vent system shown in the figure attached uses _____ 2" sanitary system pipe cleanout
fixture(s).
http://tekassistclasses.com/wp-content/uploads/2012/02/BL-PRT-181.pdf
A | four |
B | one |
C | three |
D | two |
Question 19 |
When producing a shop drawing, the first step is to _____.
A | properly locate all access doors, boots, fire dampers, and registers |
B | determine the standard symbols for use, based on the specifications |
C | select a scale two to four times larger than the scale used for the design drawing |
D | locate all ducts by dimensioning from the center line to the nearest column |
Question 20 |
According to the figure attached, the size of the condensate drain piping connected to air handling
unit No. 1 is _____.
http://tekassistclasses.com/wp-content/uploads/2012/02/BLPRT-207.pdf
A | 2" |
B | 2-1/2" |
C | 3/4" |
D | 1" |
Question 21 |
Mechanical drawings for HVAC systems are typically shown in a(n) _____ view.
A | section |
B | elevation |
C | cutaway |
D | plan |
Question 22 |
An enlargement of an area on the floor plan is called a(n) _____.
A | detail |
B | section |
C | schedule |
D | elevation |
Question 23 |
An estimator calculating the number of hangers needed for installation of a 60" rectangular duct
would base the takeoff on spacing the hangers every _____.
A | 6' |
B | 8' |
C | 4' |
D | 10' |
Question 24 |
A reflected ceiling plan is an example of a(n) _________.
A | plan view |
B | isometric view |
C | elevation drawing |
D | riser diagram |
Question 25 |
A cutaway view that shows the interior of a structure is a(n) _____.
A | elevation |
B | section |
C | schedule |
D | detail |
Once you are finished, click the button below. Any items you have not completed will be marked incorrect.
Get Results
There are 25 questions to complete.
← |
List |
→ |
Return
Shaded items are complete.
1 | 2 | 3 | 4 | 5 |
6 | 7 | 8 | 9 | 10 |
11 | 12 | 13 | 14 | 15 |
16 | 17 | 18 | 19 | 20 |
21 | 22 | 23 | 24 | 25 |
End |
Return
You have completed
questions
question
Your score is
Correct
Wrong
Partial-Credit
You have not finished your quiz. If you leave this page, your progress will be lost.
Correct Answer
You Selected
Not Attempted
Final Score on Quiz
Attempted Questions Correct
Attempted Questions Wrong
Questions Not Attempted
Total Questions on Quiz
Question Details
Results
Date
Score
Hint
Time allowed
minutes
seconds
Time used
Answer Choice(s) Selected
Question Text
All done
Need more practice!
Keep trying!
Not bad!
Good work!
Perfect!